Author:
Almeida Bernardo F.,Correia Isabel,Saldanha-da-Gama Francisco
Publisher
Springer Science and Business Media LLC
Subject
Discrete Mathematics and Combinatorics,Statistics and Probability,Management Science and Operations Research,Information Systems and Management,Modeling and Simulation
Reference33 articles.
1. Alcaraz J, Maroto C (2001) A robust genetic algorithm for resource allocation in project scheduling. Ann Oper Res 102(1):83–109
2. Alcaraz J, Maroto C (2006) A hybrid genetic algorithm based on intelligent encoding for project scheduling. In: Józefowska J, Węglarz J (eds) Perspectives in modern project scheduling, pp 249–274
3. Almeida BF, Correia I, Saldanha-da-Gama F (2015) An instance generator for the multi-skill resource-constrained project scheduling problem. Technical report, Faculdade de Ciências da Universidade de Lisboa—Centro de Matemática, Aplicações Fundamentais e Investigação Operacional. Available at https://ciencias.ulisboa.pt/sites/default/files/fcul/unidinvestig/cmaf-cio/SGama.pdf
4. Almeida BF, Correia I, Saldanha-da-Gama F (2016) Priority-based heuristics for the multi-skill resource constrained project scheduling problem. Expert Syst Appl 57:91–103
5. Brucker P, Drexl A, Möhring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: notation, classification, models, and methods. Eur J Oper Res 112(1):3–41
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献