Abstract
AbstractParallel batch scheduling has many applications in the industrial sector, like in material and chemical treatments, mold manufacturing and so on. The number of jobs that can be processed on a machine mostly depends on the shape and size of the jobs and of the machine. This work investigates the problem of batching jobs with multiple sizes and multiple incompatible families. A flow formulation of the problem is exploited to solve it through two column generation-based heuristics. First, the column generation finds the optimal solution of the continuous relaxation, then two heuristics are proposed to move from the continuous to the integer solution of the problem: one is based on the price-and-branch heuristic, the other on a variable rounding procedure. Experiments with several combinations of parameters are provided to show the impact of the number of sizes and families on computation times and quality of solutions.
Funder
Università degli Studi di Torino
Publisher
Springer Science and Business Media LLC
Subject
Discrete Mathematics and Combinatorics,Statistics and Probability,Management Science and Operations Research,Information Systems and Management,Modeling and Simulation
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献