1. Appiah, P.B. (1988)Rational comprehensive mine planning via Pareto optimal stochastic serial dynamic programming. Ph.D. thesis, University of New South Wales, Australia, 365 pp.
2. Avidan, J.S. (1974) Long range planning of gold mining using integer and separable programming.12th APCOM,1, pp. C95-C104.
3. Barbaro, R.W. and Mutmansky, J.M. (1986) Goal programming model for determining the optimal production schedule considering penalties or bonuses dependent on quality.Transactions Society of Mining Engineers of AIME,280, pp. 1887?95.
4. Bennett, H.J. and Welborn, L.E. (1971) Application of sensitivity and probabilistic analysis methods to mineral deposit evaluation.Proceedings AIME Council of Economics. Annual meeting, New York, March, pp. 165?223.
5. Brown, T.A. and Strauch, R. E. (1965) Dynamic programming in multiplicative lattices.Journal of Mathematical Analysis and Applications,12, pp. 364?70.