Author:
Lin Peng,Zhou Weiyuan,Liu Hongyuan
Publisher
Springer Science and Business Media LLC
Subject
Geology,Geotechnical Engineering and Engineering Geology,Civil and Structural Engineering
Reference34 articles.
1. Ashikhmen VA, Pronina LE (1995) Regrouting joints and its effect on the stress-strain state of the Inguri Arch Dam. Hydrotech Construct 28(10):569–580 (translated from: Gidrotekhnicheskoe Stroitel’stvo (10):1–9)
2. Barla G, Debernardi D, Sterpi D (2012) Time-dependent modeling of tunnels in squeezing conditions. Int J Geomech 12:697–710
3. Chen XH et al (1984) Structure model test of brittle materials. China Water Power Press, China, pp 1–10
4. Chow WY, Yang RQ (1984) Determination of stability of arch dam abutment using finite element method and geomechanical models. In: Proc 4th Australia–New Zealand conference on geomechanics, vol 2, Perth, pp 595–600. Publ Barton, Inst of Engineers
5. Fei WP, Zhang L, Zhang R (2010) Experimental study on a geomechanical model of a high arch dam. Int J Rock Mech Min Sci 47(2):299–306
Cited by
79 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献