Challenging Infrastructure Project Assisted by Monitoring and Numerical Modelling as the Follo Line Tunnels were Excavated Below Existing Tunnels

Author:

Trinh Nghia QuocORCID,Holmøy Kristin Hilde,Wiig Hanne Elisabeth

Abstract

AbstractJust south of Oslo Central Station, the new high-speed Follo Line railway tunnels pass beneath the existing Ekeberg road tunnels. This paper presents the construction methods, numerical model, and monitoring program used to assess the stability of the E6 road tunnels during the excavation of the Follo Line tunnels only a few metres below. The construction of the Follo Line was approved subject to three conditions: (1) there should be no negative effect on the stability of the Ekeberg tunnels, (2) the traffic flow in the Ekeberg tunnels had to be maintained at all times and (3) any risk of instability in the existing tunnels must be detected beforehand, so that necessary precautionary actions could be taken in good time. To deal with the challenges, SINTEF developed a comprehensive analysis procedure, combining continuous rock stress measurements and displacement measurements with 2D and 3D numerical modelling. The rock stress change monitoring was used together with the numerical model to monitor the stability conditions in the Ekeberg tunnels as the Follo Line tunnels were excavated. This ensured that any risk of instability in the existing tunnels could be detected in advance to enable precautionary action to be taken. The successful completion of the new tunnels without any disturbance to the road tunnels shows that the procedure would be useful for dealing with similar applications in the future.

Funder

SINTEF AS

Publisher

Springer Science and Business Media LLC

Subject

Geology,Geotechnical Engineering and Engineering Geology,Civil and Structural Engineering

Reference8 articles.

1. Aas Jakobsen (2017) Project report – ‘Engineering Geology and Hydrogeological Disciplinary Report.

2. Kruse HC (2017) Bane NOR presentation in "Supplier Meeting 2 February 2017". Available on web: https://www.banenor.no/contentassets/c0667e70caf7487f999232196f66cd2d/4.-follo-line-project---hans-christian-kruse_en.pdf. Access on 06 August 2020.

3. Lawton MF, Andersen HK, Sagen HEW, Jansen JB (2017) Drill and split, a feasible option to careful blasting?, Proceedings of the World Tunnel Congress 2017–Surface challenges–Underground solutions. Bergen, Norway.

4. SINTEF (2011) Project Report SBF2011F0026 - ‘3D-Stress measurements for Follobanen Project’.

5. SINTEF (2012) Project Report SBF2012F0346 - ‘2D-Stress measurements for Follobanen Project’.

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3