1. Aas Jakobsen (2017) Project report – ‘Engineering Geology and Hydrogeological Disciplinary Report.
2. Kruse HC (2017) Bane NOR presentation in "Supplier Meeting 2 February 2017". Available on web: https://www.banenor.no/contentassets/c0667e70caf7487f999232196f66cd2d/4.-follo-line-project---hans-christian-kruse_en.pdf. Access on 06 August 2020.
3. Lawton MF, Andersen HK, Sagen HEW, Jansen JB (2017) Drill and split, a feasible option to careful blasting?, Proceedings of the World Tunnel Congress 2017–Surface challenges–Underground solutions. Bergen, Norway.
4. SINTEF (2011) Project Report SBF2011F0026 - ‘3D-Stress measurements for Follobanen Project’.
5. SINTEF (2012) Project Report SBF2012F0346 - ‘2D-Stress measurements for
Follobanen Project’.