Author:
Deng Long-Chuan,Zhang Fu-Bing,Li Xiao-Zhao,Zhang Chi,Ji Yu-Kun,Wu Yun
Funder
the Xuzhou Science and Technology Plan Social Development Key Special Project
Publisher
Springer Science and Business Media LLC
Subject
Geology,Geotechnical Engineering and Engineering Geology,Civil and Structural Engineering
Reference32 articles.
1. Barton N (2000) TBM tunneling in jointed and faulted rock. A.A Balkema, Rotterdam
2. Bruland A (1998) Hard rock tunnel boring. PhD thesis, Norwegian University of Science and Technology, Trondheim, Norway
3. Cheng JL, Jiang ZH, Han WF, Li ML, Wang YX (2020) Breakage mechanism of hard-rock penetration by TBM disc cutter after high pressure water jet precutting. Eng Fract Mech 240:107320
4. Cho JW, Jeon S, Yu SH, Chang SH (2010) Optimum spacing of TBM disc cutters: a numerical simulation using the three-dimensional dynamic fracturing method. Tunn Undergr Space Technol 25:230–244
5. Cigla M, Yagiz S, Ozdemir L (2001) Application of tunnel boring machines in underground mine development. In: 17th International Mining Congress and Exhibition of Turkey 155–194.
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献