1. Barendsen P (1970) Tunneling with machines working on the undercutting principle. In: Proceedings of the South African Tunneling Conference, Atlanta, pp 53–58
2. Bilgin N, Balci C, Eskikaya S, Ergunlap D (1997a) Full scale and small scale cutting tests for equipment Selection in a Celestine mine. In: Proceeding of the 6th International Symposium on Mine Planning and Equipment Selection, Wroclaw, pp 387–392
3. Bilgin N, Kuzu C, Eskikaya S (1997b) Cutting performance of rock hammers and roadheaders in Istanbul Metro drivages. In: Proceeding World Tunnel Congress, Tunnels for People, Balkema, pp 455–460
4. Dey K, Ghose AK (2008) Predicting “cuttability” with surface miners—a rock-mass classification approach. J Min Met Fuels 56(5–6):85–92
5. Dey K, Ghose AK (2011) Review of cuttability indices and a new rock-mass classification approach for selection of surface miners. Rock Mech Rock Eng 44(5):601–611. doi: 10.1007/s00603-011-0147-4