1. Colwell MG (1998) Chain pillar design—calibration of ALPS. Australian Coal Association Research Program, ACARP project C6036
2. Dattatreyulu JV, Khanal M, Adhikary D, Balusu R (2012) Geotechnical studies for introducing high capacity longwalls and longwall top coal caving mining in SCCL—a case study. In: Proceedings of the 4th coal summit, New Delhi, India, September 2012
3. Gao F, Stead D, Coggan J (2014) Evaluation of coal longwall caving characteristics using an innovative UDEC Trigon approach. Comput Geotech 55:448–460
4. Golam Mostafa AKM, Chowdhury Q, Howladar MF, Ahmed M, Afroz S, Mondol AM (2009) Long wall stress distribution in 1101 coal face of the Barapukuria coal mine, Dinajpur, Bangladesh. Int J Earth Sci Eng 2(1):55–62
5. Guo Z, Jiang Y, Pang J, Liu J (2013) Distribution of ground stress on Puhe Coal Mine. Int J Min Sci Technol 23(1):139–143