1. Baker C, Parikh G, Briaud J, Drumright E, Mensah F (1993) Drilled shafts for pile foundations—FHWA-RD-92-004
2. Carter J, and Kulhawy FH (1988) Analysis and design of drilled shaft foundations socketed into rock. Electric Power Research Inst., Palo Alto, CA (USA); Cornell Univ., Ithaca NY (USA). Geotechnical Engineering Group
3. Cheng FK (1997) A laboratory study of the influence of wall smear and residual drilling fluids on rock socketed pile performance. Dissertation, Monash University
4. Cheng T-C, Chern S-G, Wu S-R, Lin Y (2016) Effect of infill moisture content and thickness on shear behavior of planar and rough rock joints. Geo Eng 47:130–135
5. Collingwood B (2000) The effects of construction practices on the performance of rock socketed bored piles. Dissertation, Monash University