Author:
Chand Mirothali,Ravi Chandrasekar
Publisher
Springer Science and Business Media LLC
Reference58 articles.
1. Home-E-Waste Monitor. https://ewastemonitor.info/. Last accessed 2023/11/30.
2. Sataloff RT, Johns MM, Kost KM, Lambert AJD, Gupta SM. Disassembly modeling for assembly, maintenance, reuse and recycling (resource management). London: CRC Press; 2004.
3. Sanchez B, Haas C. A novel selective disassembly sequence planning method for adaptive reuse of buildings. J Clean Prod. 2018;183:998–1010. https://doi.org/10.1016/J.JCLEPRO.2018.02.201.
4. Zhang XF, Zhang SY. Product cooperative disassembly sequence planning based on branch-and-bound algorithm. Int J Adv Manuf Technol. 2010;51:1139–47. https://doi.org/10.1007/s00170-010-2682-7.
5. Tian G, Zhou M, Chu J. A chance constrained programming approach to determine the optimal disassembly sequence. IEEE Trans Autom Sci Eng. 2013;10:1004–13. https://doi.org/10.1109/TASE.2013.2249663.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献