Author:
Wagg David,Neild Simon,Gawthrop Peter
Reference81 articles.
1. A. K. Agrawal and J. N. Yang. Compensation of time-delay for control of civil engineering structures. Earthquake Engineering & Structural Dynamics, 29:37–62, 2000.
2. W. Algaard, A. Agar, and N. Bicanic. Enhanced integral form of the newmark time stepping scheme for pseudodynamic testing. Engineering Computations, 18(3–4):676–689, 2001.
3. M Bacic. Hardware-in-the-loop simulation: Taxonomic framework, survery and new research directions. University of Oxford Report No. 2290/06, 2006.
4. V. Bayer, U. E. Dorka, U. Fullekrug, and J. Gschwilm. On real-time pseudo-dynamic sub-structure testing: algorithm, numerical and experimental results. Aerospace Science & Technology, 9(3):223–232, April 2005.
5. G. Benzoni. Challenges of new generation seismic testing facilities. Experimental Techniques, 25(2):20–23, 2001.
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献