1. Afentakis, P., ?An Optimal Scheduling Strategy for Flexible Manufacturing Systems,?International Journal Flexible Manufacturing Systems, Vol. 1, No. 2 (1985).
2. Blazewicz, J., Cellary, W., Slowi?ski, R., and Weglarz, J., ?Scheduling under Resource Constraints: Deterministic Models,?Annals of Operations Research, Vol. 7 (1986).
3. Blaewicz, J., Finke, G., Haupt, R., and Schmidt, G., ?New Trends in Machine Scheduling,?European Journal of Operational Research, Vol. 37, No. 3, pp. 303?317 (1988).
4. Carrie, A.S. and Petsopoulos, A.C., ?Operations Sequencing in an FMS,?Robotica, Vol. 3, No. 4, pp. 259?264 (1985).
5. Chang, Y.L. and Sullivan, R.S., ?Real-time Scheduling of FMS,? paper presented at the TIMS/ORSA Meeting, San Francisco, CA (1984).