1. Black, J.T., and Hunter, S.L., 2003, Lean Manufacturing Systems and Cell Design, Society of Manufacturing Engineers, Dearborn, Michigan.
2. Chacon, G.R., 1998, Using simulation to integrate scheduling with the manufacturing execution system, Future Fab International, 63–66.
3. Flanders, S.W., and Davis, W.J., 1995, Scheduling a flexible manufacturing system with tooling constraints: an actual case study, INTERFACES, 25(2):42–54.
4. Graham, R.L., Lawler, E.L., Lenstra, J.K., and Rinnooy Kan, A.H.G., 1979, Optimization and approximation in deterministic machine scheduling: a survey, Annals of Discrete Mathematics, 5:287–326.
5. Hasenbeign, J., Sigireddy, S., and Wright, R., 2004, Taking a queue from simulation, Industrial Engineer, 39–43.