1. Li W, Zhang JJ. Temperature decrease rule during shutdown process for buried waxy crude oil pipeline. Oil Gas Storage Transport. 2004;23(1):4–8.
2. Cui XG, Zhang JJ. Transient heat transfer problems for buried hot waxy crude pipelines. Chin Eng Sci. 2003;5(7):77–83.
3. Liu G, Zhang YY. The progress of study on the cooling process of hot oil pipeline. J Beijing Inst Petro-Chem Technol. 2010;18(3):1–16.
4. Nagano Y, Hishida M, Sun Y. Inward solidification of a high prandtl number fluid in a cooled horizontal pipe. Acta Pet Sin. 1985;6(4):88–98.
5. Li C, Li YL, Sun ZX. Heat Transfer Problem during the cooling process of waxy crude oil in the pipe. Oil Field Ground Eng. 1994;13(1):18–20, 31.