1. Bruce DA, Gallavresi F (1988) The MPSP system: a new method of grouting difficult rock formations. In: Presented at ASCE National Convention. ASCE Geotechnical Special Publication No. 14, “Geotechnical Aspects of Karst™ Terrains.” Nashville, TN. May 10–11, pp 97–114
2. Bruce DA, Davis JP (2005) Quality and quantification in small hole drilling. In: Bruce DA, Cadden AW (eds) Geo3 GEO construction quality assurance/quality control conference proceedings, Dallas/Ft. Worth, TX, November 6–9, pp 271–282
3. Bruce DA, Ressi di Cervia A, Amos-Venti J (2006) Seepage remediation by positive cut-off walls: a compendium and analysis of North American case histories. In: Canadian Dam Association Conference, September 30–October 5, Québec City, Québec
4. Bruce, DA (2007) Dam remediation by anchors and cut-offs: a summary of two national research programs, In: 38th Annual Ohio River valley soil seminar, Louisville, KY, November 14, p 35
5. Carter J, Bruce DA (2005). Enhancing the quality of the specialty contractor procurement process: creating an alliance. In: Bruce DA, Cadden AW (eds) Geo3 GEO construction quality assurance/quality control conference proceedings, Dallas/Ft. Worth, TX, November 6–9, pp 76–87