1. Caskey, G., Hari, Y., Hocken, R., Palanivelu, D., Raja, J., Wilson, R., Chen, K. and Yang, J., 1990, “Sampling Techniques for Coordinate Measuring Machine,”Design and Manufacturing Systems Conference, pp. 779–786.
2. Chang, T. C., and Wysk, R. A., 1985, An Introduction to Process Planning Systems, Prentice-Hall, Englewood cliffs, New Jersey, USA.
3. Cho, M. W. and Kim, K., 1995, “New Inspection Planning Strategy for Sculptured Surfaces Using Coordinate Measuring Machine,”International Journal of Production Research, Vol. 33, No. 2, pp. 427–444.
4. Cho, M. W. and Seo, T. I., 2002, “Inspection Planning Strategy for the On-Machine Measurement Process Based on CAD/CAM/CAI Integration Concept,”The International Journal of Advanced Manufacturing Technology, Vol. 19, pp. 607–617.
5. Cho, M. W., Seo, T. I., Kim, J. D. and Kwon, O. Y., 2000, “Reverse Engineering of Compound Surfaces Using Boundary Detection Method,”KSME International Journal, Vol. 14, No. 10, pp. 1104–1113.