Abstract
Abstract
Purpose
Maintenance dredging can often hinder port operations resulting in waiting times for seagoing vessels. The purpose of this paper is to investigate the dynamics between maintenance dredging activities and seagoing vessels, specifically focusing on how waiting times can be reduced. Then, the role of selecting different maintenance dredging strategies in reducing these waiting times is outlined.
Methods
The study analyzes historical automatic identification system (AIS) data to identify the interaction between maintenance dredging and seagoing vessels and quantify the hindrance periods for the Mississippihaven case study in the Port of Rotterdam, the Netherlands. The trajectories of the vessels are analyzed in a simple case to show how the vessels interact and how the waiting times are quantified. The interactions are checked with the Port of Rotterdam for different port calls to ensure that maintenance dredging was the reason for these delays.
Results
By analyzing the AIS data analysis of vessels in a given time window, the dredgers for maintenance work can be identified and their activities within or near the terminal can be determined. In addition, the waiting time of the seagoing vessel caused by the maintenance dredging is quantified at the terminal entrance.
Conclusion
The study discusses how the maintenance dredging operations could be improved by adjusting the loading and sailing phases of maintenance dredging and provides some theoretical and managerial insights. Alternative port maintenance strategies to minimize the waiting time caused by the hindrance are also discussed.
Publisher
Springer Science and Business Media LLC
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献