1. Bell KS, Fuchsman PC, Sacks VP, Brown LE, Epperson C, Magar VS (2022) Monitored natural recovery of contaminated sediment in Cottonwood Bay, Texas. Sediment Soil Contamin 31(7):905–924. https://doi.org/10.1080/15320383.2021.2024140
2. Brenner RC, Magar VS, Ickes JA, Foote EA, Abbott JE, Bingler L, Crecelius EA (2004) Long-term recovery of PCB contaminated surface sediments at the Sangamo-Weston/Twelvemile Creek/Lake Hartwell Superfund site. Environ Sci Technol 38:2328–2337
3. Bridges TS, Ells S, Hayes D, Mount D, Nadeau SC, Palermo MR, Patmont C, Schroeder P (2008) The Four Rs of Environmental Dredging: Resuspension, Release, Residual, and Risk. USACE DOER ERDC/EL TR-08–4
4. Bridges T, Fox R, Fuglevand P, Hartman G, Magar V, Schroeder P, Thompson T (2010) Hudson River PCBs Site: Peer Review of Phase 1 Dredging – Final Report. Prepared under contract to the U.S. Environmental Protection Agency, Contract No. EP‐W‐09‐011, Task Order No. 031. Available at https://www3.epa.gov/hudson/pdf/hudsonriverphase1dredgingreport_final.pdf (last accessed 2023).
5. Bridges TS, King JK, Simm JD, Beck MW, Collins G, Lodder Q, Mohan RK (Eds) (2021) International Guidelines on Natural and Nature-Based Features for Flood Risk Management. ERDC SR-21–6. Vicksburg, MS: U.S. Army Engineer Research and Development Center. https://doi.org/10.21079/11681/41946.