Author:
Chiu Singa Wang,Gong Dah-Chuan,Wee Hui-Ming
Publisher
Springer Science and Business Media LLC
Subject
Applied Mathematics,General Engineering
Reference14 articles.
1. M. Ben-Daya, The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. Internat. J. Production Economics,76 (2002), 257–264.
2. T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Trans.,23 (1991), 23–28.
3. S.W. Chiu and Y.P. Chiu, An economic production quantity model with the rework process of repairable defective items. J. Inform, & Optim. Sci.24 (2003), 569–582.
4. K.J. Chung, Bounds for production lot sizing with machine breakdown. Comput. & Indust. Eng.,32 (1997), 139–144.
5. P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Production Planning & Control,12, No. 6 (2001), 584–590.
Cited by
57 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献