1. Akao, S., Kurita, A., and Hiragi, H. (1987). “Effect of Directions of Concrete Placing on Behaviour of Headed Stud Shear Connectors in Push-Out Tests.”JSCE, Vol. 380, No. 4, pp. 311–320.
2. Badie, S.S., Tadros, M.K., Kakish, H.F., Splittgerber, D.L., and Baishya, M.C. (2002). “Large Shear Studs for Composite Action in Steel Bridge Girders.”,Journal of Bridge Engineering, Vol. 7, No. 3, May, pp. 195–203.
3. Eurocode 4 (1997).Design of Composite Steel and Concrete Structures, Part 2: Composite bridges (ENV 1994-2), CEN.
4. Mainstone, R.J. and Menzies, J.B. (1967) “Shear Connectors in Steel-Concrete Composite Beams for Bridges; Part 1, Static and Fatigue Tests on Push-out Specimens.”Concrete, Vol. 1, No. 9, pp. 291–302.
5. Menzies, J.B. (1971). “CP117 and Shear connectors in Steel-Concrete Composite Beams made with Normal-density or Lightweight Concrete.”Structural Engineer, Vol. 49, No. 3, pp. 137–154.