1. Alehossein H, Poulsen BA (2010) Stress analysis of longwall top coal caving. Int J Rock Mech Min Sci 47:30–41. doi: 10.1016/j.ijrmms.2009.07.004
2. Chanda ECK (1989) Evaluation of success probability in multiple seam room-and-pillar mining. Min Sci Technol 9:57–73
3. Chekan GJ, Matetic RJ, Galek JA (1986) Strata interactions in multiple-seam mining—two case studies in Pennsylvania. US Department of Interior, Bureau of Mines, Report of Investigations 9056, Pittsburgh
4. Chekan GJ, Matetic RJ, Galek JA (1988) Loading characteristics of pillars in multiple-seam mining operations. US Department of Interior, Bureau of Mines, Report of Investigations 9173, Pittsburgh
5. Chekan GJ, Matetic RJ, Dwyer DL (1989) Effects of abandoned multiple seam workings on a longwall in Virginia. US Department of Interior, Bureau of Mines, Report of Investigations, 9247, Pittsburgh