1. Asadi N (1998) The study of water tightness problem in Tangab Dam by use of dye tracers [M. Sc. Thesis (in Farsi)]: Dept. of Earth Sciences, Shiraz University, Shiraz, Iran, 206 p
2. ASCE (2021) Retrieved from: https://www.asce.org/geotechnical-engineering/conferences-and-events
3. Bruce DA, Cervia AR, Amos-Venti J (2006) Seepage remediation by positive cut-off walls: A compendium and analysis of North American case histories. ASDSO Dam Safety, Boston, MA, September, 10–14
4. Bruce DA (2011) Rock grouting for dams and the need to fight regressive thinking. Geotech News 29(2):23–30
5. Bruce DA (2012) Specialty construction techniques for dam and levee remediation. CRC Press