1. Armanini A, Larcher M (2001) Rational criterion for designing opening of slit-check dam. J Hydraulic Eng 127(2):94–104. doi: 10.1061/(ASCE)0733-9429(2001)127:2(94)
2. Armanini A, Dalrì C, Larcher M (2006) Slit-check dams for controlling debris flow and mudflow. In: Disaster mitigation of debris flows, slope failures and landslides: proceedings of the INTERPRAEVENT international symposium. Proceedings of the 11th congress INTERPRAEVENT 2006, pp 141–148
3. Ashida K, Takahashi T (1980) Study on debris flow control-hydraulic function of grid type open dam. Annu Disaster Prev Res Inst Kyoto Univ 23B–2:1–9 (in Japanese)
4. DeNatale JS, Fiegel GL, Iverson RM, Major JJ, LaHusen RG, Duffy JD, Fisher GD (1997) Response of flexible wire rope barriers to debris-flow loading. In: First international conference on debris-flow hazards mitigation—mechanics, prediction, and assessment. Proceedings of the American Society of Civil Engineers, pp 616–625
5. Fukawa G, Katsuki S, Ishikawa N, Yamada D (2002) Simulation and stochastic evaluation of open type steel check dam for damming up performance. Proc JSCE 703:165–176