Author:
Pan Dongdong,Li Shucai,Xu Zhenhao,Lin Peng,Huang Xin
Funder
National Natural Science Foundation of China
the Fundamental Research Funds of Shandong University
Publisher
Springer Science and Business Media LLC
Subject
Geology,Geotechnical Engineering and Engineering Geology
Reference36 articles.
1. Fu J, Yang J, Klapperich H, Wang S (2015) Analytical prediction of ground movements due to a nonuniform deforming tunnel. Int J Geomech.
https://doi.org/10.1061/(ASCE)GM.1943-5622.0000580,04015089
2. Garnier J, Gaudin C, Springman SM, Culligan PJ, Goodings D, Konig D et al (2007) Catalogue of scaling laws and similitude questions in geotechnical centrifuge modelling. Int J Phys Model Geo 7(3):1
3. Guo, J. Q. (2011). “Study on against-inrush thickness and water burst mechanism of karst tunnel.” Ph.D. dissertation, Beijing Jiaotong Univ., Beijing
4. Hou TX, Yang XG, Xing HG, Huang KX, Zhou JW (2016) Forecasting and prevention of water inrush during the excavation process of a diversion tunnel at the Jinping II Hydropower Station, China. SpringerPlus. 5(1):700
5. Hu XY, Wang LG, Lu YL, Yu M (2014) Analysis of insidious fault activation and water inrush from the mining floor. Int J Min Sci Technol 24(4):477–483
Cited by
53 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献