1. Dümmler M, Schömig A (1999) Using Discrete-Time Analysis in the Performance Evaluation of Manufacturing Systems. In: Proceedings of the International Conference on Semiconductor Manufacturing Operational Modeling and Simulation 1999 (SMOMS’ 99). San Francisco, CA, U.S.A., pp 1–8
2. Frederix F (1996) Planning and Scheduling Multi-Site Semiconductor Production Chains: A Survey of Needs, Current Practices and Integration Issues. In: Manufacturing Partnerships: Delivering the Promise, pp 107–116
3. Levine B (2004) Today’s Supply Chain Management Challenge: Keeping the Recovery On Track. Supplying the Stress during the Upturn. Semiconductor Manufacturing, Vol. 5, Issue 2, February 2004, pp. 39–52
4. Schneeweiss L, Wetterauer U (2000) Semiconductor Manufacturing. In: Stadtler H, Kilger C (eds) Supply Chain Management and Advanced Planning. Concepts, Models, Software and Case Studies. Springer, Berlin Heidelberg, pp 267–280
5. Schömig A, Fowler JW (2000) Modelling Semiconductor Manufacturing Operations. In: Proceedings of the 9th ASIM Dedicated Conference Simulation in Production und Logistics. Berlin, pp 56–64