1. BGR/CWAJ 1987 El Lajjun Oilshale Feasibility Study Phase I, Possibilities of and constraints to groundwater development for the water supply of the envisaged oilshale processing plant, Final Report, Amman-Jordan.
2. Chiang W H and Kinzelbach W 1998 Processing Modflow, a simulation system for modeling groundwater flow and pollution; version 5, Hamburg, Zurich.
3. Donigian A S 2003 Watershed model calibration and validation: the HSPF Experience; AQUA TERRA Consultants. JICA/WAJ 1987 Hydrologeological and water use study of the Mujib watershed; Final Report, Appendix (I), Amman-Jordan.
4. National Water Master Plan, Groundwater Resources; Volume VI, Ministry of Water and Irrigation, Amman, Jordan, 2001.
5. Tompson A F, Carle F S, Rosenberg D N and Maxwell M R 1999 Analysis of groundwater migration from artificial recharge in a large urban aquifer: A simulation perspective;Water Resour. Res. 35(10) 2981–2999.