1. “Technological solutions. The first starting set. Underground part,” Explanatory Note [in Russian], 2, Book I, Gipronikel, Saint Petersburg (2002).
2. O. V. Ovcharenko, I. I. Aibinder, K. Yu. Shilin, and H. P. Kramskov, “Geomechanical substantiation of the parameters for underground mining of “Mir” kimberlite pipe,” Fiz.-Tekh. Probl. Razrab. Polezn. Iskop., No. 6 (2002).
3. V. D. Baryshnikov, L. N. Gakhova, and N. P. Kramskov, “Stress state of ore mass in the ascending slice mining system,” Fiz.-Tekh. Probl. Razrab. Polezn. Iskop., No. 6 (2002).
4. Technological Regulations (Temporary Technological Direction) for Filling Operations in the “ Internatsionalny” Mine for the Period of 2004–2006 [in Russian], Yakutniproalmaz, Mirny (2004).
5. M. V. Kurlenya and V. K. Fedorenko, Rock Pressure Control during Mining Deep Thick Ore Deposits [in Russian], Godishn. Vish. Minko-Geol. Inst. (1980–1981).