1. Ahern, D., Clouse, A., & Turner, R. (2008). CMMI distilled: A practical introduction to integrated process improvement. Boston, MA: Addison-Wesley Professional.
2. Amland, S. (2000). Risk-based testing: Risk analysis fundamentals and metrics for software testing including a financial application case study. Journal of Systems and Software, 53(3), 287–295.
3. Bach, J. (1999). Heuristic risk-based testing. Software Testing and Quality Engineering Magazine, 11, 99.
4. Black, R. (2009). Advanced software testing vol. 2: Guide to the ISTQB advanced certification as an advanced test manager. Santa Barbara, CA: Rocky Nook.
5. Boehm, B. W. (1988). A spiral model of software development and enhancement. Computer, 21(5), 61–72.