1. Abrahao, S., & Poels, G. (2007). Experimental evaluation of an object-oriented function point measurement procedure. Information and Software Technology, 49(4), 366–380.
2. Abran, A., Desharnais, J.-M., Oligny, S., St-Pierre, D., & Symonds, C. (2001). COSMIC-FFP measurement manual, version 2.0, Software Engineering Management Research Laboratory. Montreal, Canada: Université du Quebéc à Montréal.
3. Abts, C., Boehm, B., & Clark, E. (2000). COCOTS: A COTS software integration lifecycle cost model––model overview and preliminary data collection findings, technical report USC-CSE-2000-501, USC center for software engineering. Los Angeles: USA University of Southern California.
4. Amram, M., & Kulatilaka N. (2000). Real options: Managing strategic investment in an uncertain world. Boston: Harvard Business School Press.
5. Armour, P. (2002). Ten unmyths of project estimation. Communications of the ACM, 45(11), 15–18.