1. Yufeng S, Sili F, and Changwei X, Res Phys11 (2018) 853.
2. Huang M L, and Wang L, Metall Mat Trans A29A (1982) 3037.
3. Marshall W, An assessment of integrity of PWR pressure vessels, second report by a study group under the chairmanship of, United Kingdom Atomic Energy Authority, 14 (1982) (Section-5).
4. Singh D K, Sahoo G, Basu R, Sharma V, and Mohtadi-Bonab M A, J Manuf Process36 (2018) 281.
5. Rajamurugan G, Dinesh D, and Ramakrishnan A, Int J Mech Prod Eng Res Dev8 (2018) 1641.