Author:
Afshar Mohammad Reza,Shahhosseini Vahid,Sebt Mohammad Hassan
Publisher
Springer Science and Business Media LLC
Subject
Geometry and Topology,Theoretical Computer Science,Software
Reference22 articles.
1. Afshar MR, Shahhosseini V, Sebt MH (2020a) An interval type-2 fuzzy MCDM model for work package subcontractor prequalification. Soft Comput 25:1–14
2. Afshar MR, Shahhosseini V, Sebt MH (2020) Optimal sub-contractor selection and allocation in a multiple construction project: project portfolio planning in practice. J Oper Res Soc:1–14.
3. Afshar MR, Alipouri Y, Sebt MH, Chan WT (2017) A type-2 fuzzy set model for contractor prequalification. Autom Constr 84:356–366
4. Agrawal S, Sarkar S, Srivastava G, Maddikunta PKR, Gadekallu TR (2021) Genetically optimized prediction of remaining useful life. Sustain Comput Inform Syst 31:100565
5. Beşikci U, Bilge Ü, Ulusoy G (2015) Multi-mode resource constrained multi-project scheduling and resource portfolio problem. Eur J Oper Res 240(1):22–31
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献