1. Aiex RM, Resende MGC, Ribeiro CC (2007) Ttt plots: a Perl program to create time-to-target plots. Optim Lett 1(4):355–366. https://doi.org/10.1007/s11590-006-0031-4
2. Barbosa MAL, Delbem ACB (2017) A iterated local search for the minimum spanning tree under conflict constraints (published in portuguese). In: Annals of XLVIII Brazilian symposium of operational research (Anais do XLIII Simpósio Brasileiro de Pesquisa Operacional), pp 2533–2544
3. Binato S, Hery WJ, Loewenstern DM, Resende MG (2000) A grasp for job shop scheduling. Essays Surv Metaheur. https://doi.org/10.1007/978-1-4615-1507-4_3
4. Bittencourt YB, Campêlo M, Dias FCS (2016) Mtz formulation for minimum spanning tree under conflict constraints (published in portuguese). In: Annals of XLIII Brazilian symposium of operational research (Anais do XLVIII Simpósio Brasileiro de Pesquisa Operacional), pp 2441–2448
5. Bresina JL (1996) Heuristic-biased stochastic sampling. In: Clancey WJ, Weld DS (eds) Proceedings of the 13th national conference on artificial intelligence and 8th innovative applications of artificial intelligence conference, AAAI 96, IAAI 96, Portland, Oregon, USA, August 4–8, vol 1. AAAI Press/The MIT Press, pp 271–278