1. Abbink E, Wout J van’t, Huisman D (2007) Solving large scale crew scheduling problems by using iterative partitioning. In: 7th workshop on algorithmic approaches for transportation modeling, optimization, and systems (ATMOS) pp. 96–106
2. Baradaran V, Hosseinian AH (2021) A multi-objective mathematical formulation for the airline crew scheduling problem: MODE and NSGA-II solution approaches. J Ind Manag Perspect 11(1):247–69
3. Bhunia AK, Samanta SS (2014) A study of interval metric and its application in multi-objective optimization with interval objective. Comput Ind Eng 74:169–178
4. Patty BW (2015) Handbook of operations research applications at railroads. Springer, Berlin
5. Caprara A, Fischetti M, Toth P, Vigo D, Guida PL (1997) Algorithms for railway crew management. Math Program 79:25–141