1. Aghaie A, Mokhtari H (2009) Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation. Int J Adv Manuf Technol 45(11–12):1051
2. Albayrak G, Özdemir İ (2017) A state of art review on metaheuristic methods in time-cost trade-off problems. Int J Struct Civ Eng Res 6(1):30–34
3. Alzarrad MA, Moynihan GP, Hatamleh MT, Song S (2019) Fuzzy multicriteria decision-making model for time-cost-risk trade-off optimization in construction projects. Adv Civ Eng
4. Amiri M, Abtahi AR, Khalili-Damghani K (2013) Solving a generalised precedence multi-objective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm. Int J Serv Oper Manag 14(3):355–372
5. Anagnostopoulos KP, Kotsikas L (2010) Experimental evaluation of simulated annealing algorithms for the time–cost trade-off problem. Appl Math Comput 217(1):260–270