Author:
Luo Lan,Zhang Limao,Yang Delei,He Qinghua
Funder
National Natural Science Foundation of China
China Scholarship Council
Publisher
Springer Science and Business Media LLC
Subject
Geometry and Topology,Theoretical Computer Science,Software
Reference54 articles.
1. Azar A, Dolatabad KM (2019) A method for modelling operational risk with fuzzy cognitive maps and Bayesian belief networks. Expert Syst Appl 115:607–617
2. Bakhshi J, Ireland V, Gorod A (2016) Clarifying the project complexity construct: Past, present and future. Int J Project Manage 34:1199–1213
3. Barakat HM, Abdelkader YH, Taher TS (2020) Evaluating the project completion time when non-identical Beta distributions govern the activity networks. Am J Math Manag Sci 40:1–12
4. Bosch-Rekveldt M, Jongkind Y, Mooi H, Bakker H, Verbraeck A (2011) Grasping project complexity in large engineering projects: the TOE (Technical, Organizational and Environmental) framework. Int J Project Manage 29:728–739
5. Bosch-Rekveldt MGC (2011) Managing project complexity: a study into adapting early project phases to improve project performance in large engineering projects. Dissertation, Delft University of Technology. Institute CII (2012) Performance assessment. Austin, Texas
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献