Author:
Raza S. A.,Akgunduz A.,Chen M. Y.
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Management Science and Operations Research,Control and Optimization,Computer Networks and Communications,Information Systems,Software
Reference49 articles.
1. Allen, S.J. (1990). “Production Rate Planning for Two Products Sharing a Single Process Facility: A Real World Case Study.” Production and Inventory Management 31(3), 24–29.
2. Aytug, H., M. Khouja, and F.E. Vergara. (2003).“Use of Genetic Algorithm to Solve Production and Operations Management Problems: A Review.” Interantional Journal of Production Research 41(17), 3955–4009.
3. Ben-daya, M. and M. Al-Fawzan. (1998). “A Tabu Search Approach for the Flow Shop Scheduling Problem.” European Journal of Operational Research 109(1), 88–95.
4. Bomberger, E.E. (1966). “A Dynamic Programming Approach to a Lot Size Scheduling Problem.” Management Science 12(11), 778–784.
5. Bourland, K.E. and C.A. Yano. (1997). “A Comparison of Solution Approaches for the Fixed-Sequence Economic Lot Scheduling Problem.” IIE-Transactions 29, 103–108.
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献