1. Augenstein, S., Estanislao, A., Guere, E., Blaes, S.: Optimal scheduling of a constellation of earth-imaging satellites, for maximal data throughput and efficient human management. In: Twenty-Sixth International Conference on Automated Planning and Scheduling (ICAPS 2016), p. 8 (2016)
2. Baek, S.W., Han, S.M., Cho, K.R., Lee, D.W., Yang, J.S., Bainum, P.M., Kim, H.D.: Development of a scheduling algorithm and GUI for autonomous satellite missions. Acta Astronaut. 68(7–8), 1396–1402 (2011). https://doi.org/10.1016/j.actaastro.2010.08.011
3. Barbulescu, L., Watson, J.P., Whitley, L.D., Howe, A.E.: Scheduling space-ground communications for the air force satellite control network. J. Sched. 7(1), 7–34 (2004). https://doi.org/10.1023/B:JOSH.0000013053.32600.3c
4. Bianchessi, N., Cordeau, J.F., Desrosiers, J., Laporte, G., Raymond, V.: A heuristic for the multi-satellite, multi-orbit and multi-user management of Earth observation satellites. Eur. J. Oper. Res. 177(2), 750–762 (2007). https://doi.org/10.1016/j.ejor.2005.12.026
5. Bianchessi, N., Righini, G.: A mathematical programming algorithm for planning and scheduling an earth observing SAR constellation. In: 5th International Workshop on Planning and Scheduling for Space, p. 6 (2006)