1. V. F. Golovko, I. V. Dmitrieva, N. G. Kodochigov, et al., “Features of adapting gas turbine cycle and heat exchangers for HTGRs,” in: Proceedings of a Technical Committee Meeting, Palo Alto, November 14–16, 2000, IAEA-TECDOC-1238 (2001), pp. 63–74.
2. V. F. Golovko, A. I. Kiryushin, N. G. Kodochigov, and N. G. Kuzavkov, “State of HTGR development in Russia. Design and development of a gas cooled reactors with closed cycle gas turbines,” in: Proceedings of a Technical Committee Meeting, Beijing, China, Oct. 30–Nov. 2, 1995, pp. 31–46.
3. M. Labar, A. Shenoy, W. Simon, and E. Campbell, “The gas-turbine modular helium reactor,” Nucl. News, 46, No. 11, 28–37 (2003).
4. Power Conversion Unit Development, General Atomics Report, San Diego, California (2004).
5. A. I. Kiryushin, N.G. Kodochigov, N. G. Kouzavkov, et al., “Project of the GT-MHR high-temperature helium reactor with gas turbine,” Nucl. Eng. Design, 173, 119–129 (1997).