Abstract
AbstractTo improve the sustainable management of phosphorus, numerous LCA studies, using primary data, have been conducted for phosphorus recovery technologies from wastewater, but not for phosphate rock mining.This article addresses this issue by conducting a cradle to gate assessment of beneficiated phosphate rock production using primary data. This study aims to share an updated Life Cycle Inventory dataset of beneficiated phosphate rock production.The studied system is the open-pit mining operations and the wet beneficiation process located in the south of Tunisia. The functional unit is 1 kg of P2O5. Twelve environmental impact categories were assessed using the ReCiPe Midpoint method.The results of Life Cycle Inventory show that the average loss of phosphorus between mining operations, mechanical preparation, and the wet beneficiation is 0.3 kg of P2O5 per 1 kg P2O5. The losses occur mainly during the scrubbing and hydrocycloning. Compared to the production system in Florida, USA, according to the Ecoinvent database 3.4, the production of 1 kg P2O5 in Tunisia has higher Global Warming Potenzial, higher water depletion potential, higher PM10 emission, Photochemical oxidant formation, soil pollution potential, and human toxicity potential.In conclusion, primary data shows comparable results to the generic Life cycle Inventory of wet beneficiation phosphate rock in the Ecoinvent database. This study contributes to enlarge data about sedimentary phosphate rock extraction and beneficiation globally as currently only the USA and Morocco were reported in databases.
Funder
Deutscher Akademischer Austauschdienst
Karlsruher Institut für Technologie (KIT)
Publisher
Springer Science and Business Media LLC
Reference31 articles.
1. EMPA; ETH; ESU-services (Ecoinvent report No. 8, V.2).;H-J Althaus,2007
2. Azouazi M, Ouahidi Y, Fakhi S, Andres Y, Abbe JC, Benmansour M (2001) Natural radioactivity in phosphates, phosphogypsum and natural waters in Morocco. J Environ Radioact 54(2):231–242. https://doi.org/10.1016/S0265-931X(00)00153-3
3. Bronzo Perasso-carrière et bétons (2018): Demande d’autorisation environnementale unique pour l’exploitation d’une installation classe pour la protection de l’environnement, Renouvellement de l’autorisation d’exploiter avec extension de la carrière de sainte-Marthe: Pièce 5‑Demande d’autorisation les effets sur la santé. Application for a single environmental permit for the operation of an installation classed for environmental protection, Renewal of the authorization to operate with extension of the quarry of Sainte-Marthe: Exhibit 5‑Application for authorization health effects. Edited by Bronzo Perasso-carrière et bétons, checked on 2/22/2020.
4. Charni Majoubi H, Abbes A, Aboudi A, Khayati S, Grauby A, Gharbi HA, Mtimet S (1991) Étude de la radioactivité naturelle dans le sol du sud tunisien Région de Gafsa Tozeur. Radioprotection 26(3):537–549. https://doi.org/10.1051/radiopro/1991019
5. Direction of Accounting (2017) Tableau de bord de gestion et des indicateurs de performance de 2016: les coût complets. File number 6. Internal document
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献