1. GD 10–577–03 (2003) Standard instruction for metal inspection and boilers, turbines and pipelines main elements lifetime extension at thermal power plants. Moscow: Technical supervision of Russia
2. GD 34.17.452–98 (1998) Methodical guidelines on the work performance procedure during the residual life assessment of power plants boiler superheaters. Moscow: Technical supervision of Russia
3. Filimonov OV, Bogdanov VF (1987) Magnetic method for boiler heating surface tubes state monitoring // Power Plants. (1):20–24
4. Pyanov AA, Shumovskaya MA (2016) Principles of operational control of superheaters made of grade DI59 austenitic chromium-manganese steel // Metals Week in Moscow, November 10–13, 2015: Proceedings of the conference. Moscow: JSC ACC VNIIMETMASH, pp. 61–69
5. Bogachev VA (2015) Technique for residual life determination for grade DI59 steel superheaters / V.A. Bogachev, V.V. Svetushkov, Yu.G. Potapovich, G.A. Urusova, M.A. Shumovskaya // Power Plants.(5):16–20