1. Uzsoy, R., Lee, C.Y., Martin-Vega, L.A.: A review of production planning and scheduling models in the semiconductor industry, part I: system characteristics, performance evaluation and production planning. IIE Trans. Sched. Logist. 24(4), 47–61 (1992)
2. Uzsoy, R., Lee, C.Y., Martin-Vega, L.A.: A survey of production planning and scheduling models in the semiconductor industry, part II: shop-floor control. IIE Trans. Sched. Logist. 26, 44–55 (1994)
3. Brucker, P., Gladky, A., Hoogeveen, H., Kovalyov, M.Y., Potts, C.N., Tautenhahn, T., van de Velde, S.L.: Scheduling a batching machine. J. Sched. 1(1), 31–54 (1998)
4. Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization an approximation in deterministic sequencing and scheduling: a survey. Ann. Discret. Math. 5, 287–326 (1979)
5. Zhang, G.C., Cai, X.Q., Wong, C.K.: Online algorithms for minimizing makespan on batch processing machines. Naval Res. Logist. 48(3), 241–258 (2001)