1. Chunhe W, Aijun Z, Xiangfu F et al (2018) Study of numerical test on surrounding rock of super large section tunnel under excavation by bench cut method and CRD method[J]. Highway 05:318–322
2. Dong X (2020) Analysis of tunnel engineering construction technology[J]. Consume Guide 4:221–224
3. Jiayi H (2012) Parameters analysis and application of bench method for high-speed railway tunnels[J]. Modern Tunnelling Technology 49(03):77–82
4. Libing Du, Songhong Y, Baijie C (2013) Study on safety of small-spaced intersecting tunnels constructed by bench-cut method[J]. Tunnel Construct 05:48–52
5. Rong L, Song R, Jinyang F et al (2019) The air flow structure and gas dispersion behavior in gas tunnel construction through bench cut method[J]. Therm Sci 23:206–206