1. Bieniawski ZT (1981) Improved design of coal pillars for US mining conditions. In: Paper presented at proc 1st conference on ground control in mining, Morgantown, West Virginia University, July 27–29
2. Esterhuizen GS, Mark C, Murphy MM (2010) Numerical model calibration for simulating pillars, gob and overburden response in coal mines. In: Paper presented at proceedings of the 29th international conference on ground control in mining, Morgantown, West Virginia University, July
3. Gale WJ (1999) Experience of field measurement and computer simulation methods for pillar design. In: Paper presented at proceedings of the second international workshop on coal pillar mechanics and design. US National Institute for Occupational Safety and Health
4. Ghasemi E, Shahriar K (2012) A new coal pillars design method in order to enhance safety of the retreat mining in room and pillar mines. Saf Sci 50:579–585
5. Ghasemi E, Ataei M, Shahriar K (2014) An intelligent approach to predict pillar sizing in designing room and pillar coal mines. Int J Rock Mech Min 65:86–95