1. Campoli AA, Kertis CA, Goode CA (1987) Coal mine bumps: five case studies in the eastern United States. US Bureau of Mines, IC9149: (34)
2. Campoli AA, Barton TM, Van Dyke FC, Gauna M (1990) Mitigation destructive longwall bumps through conventional gate entry design. US Bureau of Mines, RI 9325, (38)
3. Carr F, Martin E, Gardner BH (1984) How to eliminate roof and floor failures with yield pillar. Coal Min Part II:44–49
4. Carr F, Martin E, Gardner BH (1985) How to eliminate roof and floor failures with yield pillar. Coal Min Part II(44–49)
5. Esterhuizen E, Mark C, Murphy M (2010) Numerical model calibration for simulation coal pillars, gob and overburden response. In: Proceeding of the 29th international conference on ground control in mining, Morgantown, WV (46–57)