1. An BF, Zhang JX, Li M et al (2016) Stability of pillars in backfilling mining mining face to recover room mining standing pillars. J Min Saf Eng 33(2):238–243
2. Baldi A (2014) Residual stress measurement using hole drilling and integrated digital image correlation techniques. Exp Mech 54(3):379–391
3. Chang ZG, Zhang JM, Chen YJ et al (2016) Research on triangle-coal recycling amount in parallel open pit coal mine with total inner dumping covering end slope. J Coal Eng 48(9):54–56
4. Ding XP, Li SC, Wang J et al (2013) Optimization of underground mining development direction about end slope coal pillar recovery of open-pit coal mine. J China Coal Soc 38(11):1923–1928
5. Dong HN (2015) Study of numerical simulation on strata behavior sat rotary mining face. J Coal Technol 34(9):30–32