1. Banerjee G, Ray AK, Singh GSP, Yadav KP (2001) Hard roof management—a key for high production in longwall coal mines. Technical Note (unpublished), p 13
2. CIMFR S&T Report (GAP/30/MT/MOC/01 -02) (2003) Investigations to optimize blast design and charge loading parameters in coal for ringhole blasting and in stone for induced blasting in degree-I seams for blasting gallery method in underground mines of The Singareni Collieries Company Limited (SCCL) (Project leaders: P. Pal Roy and C. Sawmliana). Ministry of Coal. Government of India, New Delhi, p 89
3. Choudhury M (2002) Pre-fracturing of roof rocks—a possible future strategy for successful longwall mining in India. Journal of Mines, Metals and Fuels 50(6):219–224
4. Ghose AK (1988) Design of drilling and blasting system—a rock mass classification approach. Balkema, Mine Planning and Equipment Selection, pp 335–340
5. Khera SC, Agarwal RK (1996) Hard roof management as tried in Datong Coalfield. The Indian Mining and Engineering Journal 35(1):31–34