Author:
Chen Lei,Wang Huitao,Xu Xinji,Zhang Qingsong,Li Ningbo,Zhang Lingli
Funder
National Program on Key Basic Research Project of China
National Key Scientific Instrument and Equipment Development Project
National Natural Science Foundation of China
Key Research and Development Plan (Major Key Technology) of Shandong Province
Major Science and Technology Projects of Henan Province
National Key Research and Development Plan
Transportation and Technology Plan of Shandong
Publisher
Springer Science and Business Media LLC
Subject
Geology,Soil Science,Geotechnical Engineering and Engineering Geology,Architecture
Reference22 articles.
1. Ashida Y (2001) Seismic imaging ahead of a tunnel face with three-component geophones. Int J Rock Mech Min Sci 38(6):823–831.
https://doi.org/10.1016/S1365-1609(01)00047-8
2. Ashida Y, Sassa K (1993) Depth transform of seismic data by use of equi-travel time planes. Explor Geophys 24(4):341–346.
https://doi.org/10.1071/EG993341
3. Bayati M, Hamidi JK (2017) A case study on TBM tunnelling in fault zones and lessons learned from ground improvement. Tunn Undergr Space Technol 63:162–170.
https://doi.org/10.1016/j.tust.2016.12.006
4. Chen L, Zan Y, Wang J, Du J (2004) Reinforcement of surrounding rocks of tunnel in landslide area with grouting technology. Chin J Rock Mech Eng 23(16):2761–2765
5. Chen L, Li S, Liu B, Li M, Xu X, Li N, Nie L (2018) The imaging method of seismic ahead prospecting in tunnel based on ellipse evolving CRP stacking and application. Chin J Geotech Eng 40(6):1–9.
https://kns.cnki.net/kcms/detail/32.1124.TU.20171212.1549.024.html
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献