Publisher
Springer Science and Business Media LLC
Reference33 articles.
1. T. Zeng, Design overview of AP1000 steam turbine bypass discharge system. Sci. Technol. Vis. 10, 42–43 (2021). https://doi.org/10.19694/j.cnki.issn2095-2457.2021.10.12. (in Chinese)
2. B.F. Jia, Analysis of the steam venting control system in passive nuclear power plant. Autom. Instrum. 37, 60 (2016). https://doi.org/10.16086/j.cnki.issn1000-0380.201610017. (in Chinese)
3. L. Zhu, Analyses of steam bypass system of M310 and domestic mainstream reactor types. Electr. Eng. 16, 55 (2020). https://doi.org/10.19768/j.cnki.dgjs.2020.16.023. (in Chinese)
4. D.J. Yoon, Y.S. Kim, J.Y. Lee et al., Optimization for setpoints of steam generator water level control systems in power-uprated YGN 1 and 2 and Kori 3 and 4. J. Nucl. Sci. Technol. 42, 1067–1076 (2005). https://doi.org/10.1080/18811248.2005.9711059
5. J.Y. Lee, Determination of the optimal steam dump control system set-points after power uprate of Kori 3/4 and Yonggwang 1/2 Units, in Proceedings of the American Nuclear Society. America: American Nuclear Society, pp. 790–797 (2005)