1. Abou G. M., Motavalli, S., Nawara, G., Reyad, A. (2000). An integrated planning system for tool management and part scheduling in FMS. In 4th International conference on engineering design and automation, Orlando, FL.
2. Alcaide, D., Gonzates, A. R., & Silcilik, J. (2006). A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures. International Journal of Flexible Manufacturing System, 17(3), 201–226.
3. Ali, M. (2012). Impact of routing and pallet flexibility on flexible manufacturing system. Global Journal of Flexible Systems Management, 13(3), 141–149.
4. Ali, M. (2013). Information based decision and control in flexible manufacturing systems. Industrial Engineering Journal, 6(6), 12–19.
5. Ali, M., Salahuddin, & Khan, M. A. (2010). Analysis of the impact of routing flexibility on the performance of flexible system. International Journal of Industrial Engineering, 17(4), 269–278.