Author:
Folgado R.,Henriques E.,Peças P.
Publisher
Springer Berlin Heidelberg
Reference13 articles.
1. Tan, B., (1998): Agile Manufacturing and Management of Variability, in: Int. Trans. Opl Res, Vol. 5, No. 5, pp. 375-388.
2. Erlebacher, S., Singh, M., (1999): Optimal Variance Structures and Performance Improvement of Synchronous Assembly Lines, in: Oper. Res., Vol. 47, No. 4, pp. 601-618.
3. Lassila, A., et al.., (2005): Modelling and Simulation of Human Centred Assembly Systems – A Real Case Study, in: 6th IFIP, pp.405-412. Vienna, Austria.
4. Mason, S., et al. (2005): Improving the design process for factories: Modeling human performance variation, in: J Manuf. Syst, Vol. 24, No.1, pp. 47-54.
5. Doerr, K., Arreola-Risa, A., (2000): A worker-based approach for modeling variability in task completion times IIE Transactions, Vol. 32, No.7, pp. 625-636.